Barn Restoration Phase Two

The second phase of restoring the Barn included controlling the erosion. We did this by placing retaining walls to redirect the water flow.

We also needed to redo the water lines so we could provide a constant supply of water to our Livestock.

Further erosion control was needed below the barnyard

The photo below shows the retaining wall with the water supply cut in

The next phase will be to restore the flooring in the upper level of the barn